Sinosun Group

  • Increase font size
  • Default font size
  • Decrease font size
Asphalt Mixing Plant LB Series

Asphalt Mixing Plant LB Series

E-mail Print PDF

 

Types and main parameters: 

Type Plant Capacity
(standard
conditions):
Mixer
Capacity:
Consumption
(standard
conditions):
Measurement
accuracy
Fuel Coal
LB800 64t/h 800kg 5.5-7 kg/t 10kg/t Aggregate: ±0.5%
0.5% Powder: ±0.5%
Asphalt: ±0.25%
LB1000 80t/h 1000kg 5.5-7 kg/t 10kg/t
LB1100 90 t/h 1100 kg 5.5-7 kg/t 10kg/t
LB1200 100t/h 1200kg 5.5-7 kg/t 10kg/t
LB1250 105 t/h 1250 kg 5.5-7 kg/t 10kg/t
LB1500 120t/h 1500kg 5.5-7 kg/t 10kg/t
LB1600 130 t/h 1600 kg 5.5-7 kg/t 10kg/t
LB2200 175 t/h 2200 kg 5.5-7 kg/t 10kg/t
LB2500 200 t/h 2500 kg 5.5-7 kg/t 10kg/t
LB3000 240 t/h 3000 kg 5.5-7 kg/t 10kg/t

Main Structures of the Asphalt Mixing Plant

LB01  1.Cold aggregate supply system
Components:
storage bins and belt feeder , aggregate belt conveyer.
Features:
The feeding belts are driven by variable frequency electric motors, which feature reliable performance.
The cold aggregate feed bin features modular design for easy transportation.
We have 3,4,5 storage bins for your choice.

 
LB02 

2. Tilted Charging Conveyor Belt Assembly
Components :
tilted charging conveyor belt, middle filter sieve
Feature:
gravity middle filter sieve, little dust overfall, prevent larger waste fall into drying drum, be good for reducing heat lost, prevent jamming hot aggregate elevator or vibrator.

LB03  3.Drying drum
The drum lined with a 50mm thick insulation (rock wool).Aggregate lifting flights that assist the heat exchange between aggregates and flame are installed inside the dryer drum, which enables the drum dryer to reach maximum heating efficiency.Four friction rollers for smooth drive and evenly distributed forces.
LB04  4.Burning system
For the burner , we have fuel burner (light oil, for both light and heavy oil), coal burner or for both fuel and gas use burner, pipelines,oil tank
LB05  5.Hot aggregate elevator
Elevated by Single row of chain,special structure for outlet will reduce the abrasion and noises.
LB06  6.Dust removal system
1.bag house
2. gravity separator (snail shell shaped)
3.cyclone separator
4.wet scrubber
LB07 

7. Mixing building
①Vibrating Screen
②Hot aggregate hopper
③ weighing hopper
④Mixing device
Features:
a.Asphalt mixing plant which designed and manufactured adopts european techniques.
b.Double-shaft retrograde rotation,making the aggregate overturn up and down 15-20S , to ensure the mixture to be mixed well.
⑤Bitumen spray system

LB08  8.Filler supply system
Components:
Filler elevator, Filler temporary storage bin, spiral conveyor.
The outlet of the screw conveyor is installed with a butterfly valve to control the wallop. The filler interim silo is equipped with a pneumatic arching break unit.
LB09  9. Pneumatic control system
Components:
air compressor, cylinders, valves and air pipe manifold.
Reliable FESTO air cylinders and electromagnetic valves are used.
LB10  10.Bitumen supply system
Components:
bitumen discharge vessel,bitumen tank, heat conducting oil boiler, light oil burner, pipe manifolds, pumps and valves.
Features:
1.Reasonable bitumen pipe arrangement with insulation to reduce heat loss
2. Heat conducting oil boiler with automatic control system for independent operation and control. 3.Bitumen tanks with level and temperature indicators
LB11  11. Electric control system
1) control room:Container pattern structure.
2).Box type control cabinet, main electric parts are SIMENS , Schneider, ABB etc. global famous brand.Functions of interlock and secondary protection.Start of large power electric motors at reasonably low voltage. The operation board configured with manual controlled urgent operation device, digital displays of aggregate scales, filler scales and bitumen scale, digital converters of cold aggregates, temperature displays of key positions and electric current displays of critical components
LB12  12.Side Placed Hot Mix Asphalt Silo
1.The silo is divided into three sections: upper, middle and lower, and two compartments: left and right, for easy transportation and erection.
2.Silo is insulated.
3.Anti-segregation device is configured inside the silo.
4.The bottom of silo and the discharge floodgate are electrically heated.
Last Updated on Tuesday, 18 June 2013 08:35  

Live Support

press_release

LATEST NEWS

sinosun-at-philbex-2013 SINOSUN at PHILBEX 2013Dates: 23-26, May, 2013 Venue: Cebu International Convention CenterBooth No.:P75 SINOSUN Group has once again been at the...
visit-to-ctt-2013Exposition Date: 2013.06.04-06.07Pavilion Name: International Exhibition Center Crocus ExpoPavilion Add: The 65-66km of the Moscow Ring Auto Road, Moscow...
our-kenya-cusotmers-visited-asphalt-mixing-plant On April, 2th, we have our Kenya customers visited our asphalt mixing plant factory.Welcome to our asphalt plant factory.As professional asphalt plant...